Home / Start a pilot
Fast startStart with a 4-week pilot
A working system in production conditions inside a month — with your data, your integrations and acceptance criteria agreed before we build. Then convert to enterprise deployment on the architecture the pilot already proved.
Why a pilot, not a POC
A proof of concept proves nothing about your estate
Demonstrations on curated data are easy. We would rather be judged on your data, your network conditions and your integration constraints.
Scope and data assessment
Two days on site or on call with your operations, planning and IT teams. We agree the pilot boundary — one division, one terminal, one corridor — profile your existing survey, drawing and register data, and set the acceptance criteria we will be measured against.
Data build and model configuration
We build the connected model for the pilot area from your data plus any gap-filling survey or imagery, configure the domain schema to your asset hierarchy, and stand up the environment in your cloud or ours.
Integration and deployment
Integration to the systems that matter for the pilot decision — SCADA, ERP, head-end, billing or EAM — followed by role-based access, dashboards and the field application configured for your workflows.
Field trial, measurement and handover
Real users in production conditions. We measure against the acceptance criteria set in week one, run training for administrators and field supervisors, and deliver the findings report with a costed scale-up plan.
Deliverables
What you get at the end of week four
- Working platform deployed on your infrastructure or ours, with your data loaded
- Connected asset or network model for the agreed pilot boundary
- Two to three live integrations to your systems of record
- Configured dashboards and an offline-capable field application
- Data quality assessment report, including where fresh survey is unavoidable
- Measured results against the acceptance criteria agreed in week one
- Scale-up plan and architecture for full deployment
- Administrator and supervisor training, with documentation
What we need
What we need from you
- A named business owner who can make decisions inside the four weeks
- Access to existing survey, drawing, register or meter data for the pilot area
- Two to three technical contacts for the systems being integrated
- Field access for one to two days of validation, where the pilot needs it
- Agreement on acceptance criteria before we start building
If any of these are not available, tell us at the scoping call. We will either adjust the pilot boundary or advise you to wait — a pilot without a decision-maker is just a longer demo.
Start in 4 weeks
A focused pilot on one division, terminal or corridor — in production conditions with your data and your integrations. Convert to enterprise deployment on the same architecture, with no re-platforming.
After the pilot
What conversion looks like
No renegotiation of architecture. The pilot environment becomes the production environment.
Findings review
Measured results against week-one acceptance criteria, presented to your steering group with the data quality assessment.
Scale-up plan
Full-estate rollout scoped by division, site or corridor, with the work separated clearly by phase.
Enterprise deployment
Typically 8 to 16 weeks to full production, running on the architecture and integrations the pilot already validated.
Handover
Your team trained to administer and extend the platform. Schemas and data remain yours in open formats.
Book the pilot scoping call.
Thirty minutes to agree the pilot boundary, the decision it must support and the acceptance criteria. We will tell you honestly if a pilot is premature.
